0
Skip to Content
Rodríguez Studio
home
work
about
press
process
contact
resources
Inquire About a Project
Rodríguez Studio
home
work
about
press
process
contact
resources
Inquire About a Project
home
work
about
press
process
contact
resources
Inquire About a Project

Some of the best homes are the hardest to say yes to. The apartment left untouched for forty years. The two units that could become one. The townhouse that needs everything.

A listing shows what a home is. It does not show what the building will permit, what the structure will allow, or what the work will cost. We answer those questions while there is still time to act on them.

WHAT THE REVIEW ANSWERS


What can change

We walk the home and study the available drawings to form a preliminary view of the structure, the plumbing lines, and the ceilings. You learn which rooms can open and whether a kitchen or bath can move.


What must be approved

We read the alteration agreement and house rules, the building department record, zoning, and landmark status. You receive a summary of each approval the work is likely to need.


When work could begin

Design, board or agency review, permit filing, and bidding each take time. You receive a schedule of milestones to an estimated construction start.


What it is likely to cost

You receive a rough budget range for the changes you have in mind, drawn from comparable projects, with the items most likely to add cost or time.

FROM OUR FILES

The house looked beyond saving.

A brownstone in Brooklyn Heights had leaked from roof to cellar and was mostly uninhabitable. It looked like a house to walk away from.

We studied it with the buyers before they committed. Zoning allowed a rear extension. The attic could be reclaimed as living space. A tenant unit could be added without giving up the owners' privacy. With those facts in hand, they could do the math.

They bought the house, made it their home for over 15 years, before moving on and selling for a gain.

before image

Existing conditions

Sometimes the right answer is no.

The owners of a penthouse duplex wanted to add a private elevator. We identified the only locations where a shaft could fit and laid out the approval process with building management.

Our advice was to leave it out. The cost was high, management was likely to push back, and the shaft left awkward space on both floors. The owners decided against it.

Rodríguez Studio Architecture PC 139 Fulton Street, 715  ·  New York, NY 10038 Also serving Puerto Rico  Licensed in New York · New Jersey · Connecticut   info@rodriguezstudio.com © 2026 Rodríguez Studio Architecture PC. All rights reserved.